Project

General

Profile

Actions

Feature #7758

closed

Add ability to download and upload Cancelled jobs

Added by Anton Vasilyev over 7 years ago. Updated about 7 years ago.

Status:
Closed
Priority:
High
Category:
Bridge
Target version:
-
Start date:
11/28/2016
Due date:
% Done:

0%

Estimated time:
Published in build:

Description

If there are some results with solved tasks but job is Cancelled when it is useful to have ability to download and upload these results to different Klever instance

Actions #1

Updated by Evgeny Novikov over 7 years ago

  • Assignee set to Vladimir Gratinskiy
  • Priority changed from Normal to High

Have we any obstacles for that?

Actions #2

Updated by Vladimir Gratinskiy over 7 years ago

Evgeny Novikov wrote:

Have we any obstacles for that?

I don't remember. I've created the branch "download_cancelled" where downloading cancelled jobs is allowed so Anton can experiment with his cancelled jobs.
A job has a lot of data, so if it is corrupted then for example Recalculation of cache can fail (it is happening when jobs are uploaded). Cancelling the job will corrupt its data in common case.

Actions #3

Updated by Evgeny Novikov over 7 years ago

  • Status changed from New to Feedback

I think that this will be the main trouble. IMHO even for uploaded canceled and corrupted jobs caches should be recalculated in the way that is possible, i.e. all failures should be ignored. I think that this is already done for decided jobs since corresponding information (Safes, Unsafes, Unknowns, resources) is shown gracefully even for canceled and corrupted jobs. Let's wait for Anton feedback.

Actions #4

Updated by Vladimir Gratinskiy over 7 years ago

Evgeny Novikov wrote:

I think that this will be the main trouble. IMHO even for uploaded canceled and corrupted jobs caches should be recalculated in the way that is possible, i.e. all failures should be ignored. I think that this is already done for decided jobs since corresponding information (Safes, Unsafes, Unknowns, resources) is shown gracefully even for canceled and corrupted jobs. Let's wait for Anton feedback.

Cache is calculated during decision. But it can't be realculated manually (on manager's tools page) for cancelled and corrupted jobs.

Actions #5

Updated by Evgeny Novikov over 7 years ago

Vladimir Gratinskiy wrote:

Evgeny Novikov wrote:

I think that this will be the main trouble. IMHO even for uploaded canceled and corrupted jobs caches should be recalculated in the way that is possible, i.e. all failures should be ignored. I think that this is already done for decided jobs since corresponding information (Safes, Unsafes, Unknowns, resources) is shown gracefully even for canceled and corrupted jobs. Let's wait for Anton feedback.

Cache is calculated during decision. But it can't be realculated manually (on manager's tools page) for cancelled and corrupted jobs.

As in #7525 this limitation looks really strange. We do need to refactor caches recalculation.

Actions #6

Updated by Evgeny Novikov about 7 years ago

  • Status changed from Feedback to Closed

It was implemented together with #7902, #7897 and #7891.

Actions

Also available in: Atom PDF